Contract Type: 
Contract
Date: 
Saturday, January 15, 2022 - 14:00
Location: 
Lingor
Local Time: 
15:45
Local Weather: 
Clear Skies
Employer(s): 

Mozart PMC

Mission Type: 
Co-Op
Campaign: 
Die Walküre

Situation

A Mozart PMC recon squad deployed to Pintosa factory to the far South West of Lingor has been discovered and attacked by the PLR. While they report 50% KIAs they have managed to break contact and hide in an office building in Medlina. No further contact has been received, though other undercover teams report the PLR has begun to manoeuvre towards Medlina.


Objectives

Theseus are to rescue the surviving operatives in Medlina and return them to either FOB in addition to recovering the four bodies left in Pintosa.

Primary Objective(s)
  • Rescue four Mozart PMC survivors.
Secondary Objective(s)
  • Recover four Mozart PMC bodies.

Equipment

Ground
  • GAZ-3937 Vodnik x4
  • BRDM-2 (HQ) x1
Air
  • Ka-60 Kasatka (Unarmed) x2
  • Ka-60 Kasatka (6.5mm Minigun and 12x CRV7 HE) x1
Special
  • N/A

Area of Operations

Map of AO

After action report: 

Theseus teams successfully retrieved both the four surviving Mozart PMC team members and the four KIA Mozart team members, airliftng all to the southern base. The Ares teams fought off multiple squads of PLR soldiers during the firefights. Nemesis was instrumental in CAS action versus enemy units.

Two contractors were KIA.